Daily Field Report

Date :07/29/2025
Project No :2024C213
Client Company :WDG
Arrival Time :07/29/2025 07:00
Onsite Hours :02:00
Name of the Project :Covington Town Center PH II
Project Location :Covington, GA
Weather :Partly cloudy
Departure Time :07/29/2025 09:00
ASEC Technician Name :Austin Coleman

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Our ASEC representative arrived on site to observe the placement of 19mmSP asphalt mix for the roadway.  Back-scatter density testing was performed on newly placed asphalt following compaction with a smooth-drummed roller.  A total of fifteen (15) density tests were taken.  The results are stated below:

Test Section #1:  139.1 pcf (left), 137.9 pcf (center), 136.5 pcf (right) [location northwest]

Test Section #2:  139.7 pcf (left), 134.8 pcf (center), 145.0 pcf (right) [location southwest]

Test Section #3:  140.7 pcf (left), 135.9 pcf (center), 134.3 pcf (right) [location southeast]

Test Section #4:  138.5 pcf (left), 133.9 pcf (center), 130.3 pcf (right) [location east]

Test Section #5:  142.3 pcf (left), 140.2 pcf (center), 141.9 pcf (right) [location north]

Note:  left, center, right = side of lane tested as oriented to direction of placement.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

 

 

 

Technician Signature / DateAustin Coleman, July 29, 2025
Reviewer Name / DateKenneth Mosman, August 05, 2025