- Home
- Daily Field Report Report ID: 83902
- This project is inactive from admin. Download Report
Daily Field Report
Date :08/01/2025
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :08/01/2025 11:30
Onsite Hours :05:15
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :
Departure Time :08/01/2025 16:45
ASEC Technician Name :Solomon Cherie
Observations/Finding
- I and Bal went to the project site to do DCP. We figure out it was 4 lots that is going to have dcp tests.
- I did the dcp tests for Lot#10 and Lot#11.
- The dcp tests were done manually at four corners for each Lots.
- Two tests were encountered rock and an offset of 2′ far were done,
- The remaining tests were done to 4 feet.
- All of them were showing 8 and above blows of dcp
- The result finally was analuazed and synthesized and presumed to pass the test.
Technician Signature / DateSolomon Cherie, August 1, 2025
Reviewer Name / DateKenneth Mosman, August 05, 2025