Density Test Report

Date :08/13/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :08/13/2025 10:00
Onsite Hours :08:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :08/13/2025 18:00
ASEC Technician Name :Safiullah Momand

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/13/2025 1 16.6 96.1 2025-031 SP 101.0 20.7 Check
Location : Between manholes A2-A3, Elv/Depth :12 feet below finished grade
Comment : On point proctor to determine the material used for compaction
Technician Signature / DateSafiullah Momand, August 13, 2025
Reviewer Name / DateKenneth Mosman, August 14, 2025