Daily Field Report

Date :08/01/2025
Project No :2025C146
Client Company :Davidson Homes, LLC
Arrival Time :08/01/2025 9:00
Onsite Hours :07:00
Name of the Project :Greene Farms Subdivision
Project Location :1451 Highway 113, Cartersville, Georgia
Weather :sunny
Departure Time :08/01/2025 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

  • The placement and compaction of fill for Lots #120 through #121 and Lots #80 through #88, as well as for the stormwater trench between MHA12 to MHA12.1 and MHA13 to MHA13.1, continued on this day. Upon arrival, the ASEC representative observed active work in progress, with fill being placed in 1-foot lifts. Compaction was carried out using a CP56B sheepsfoot roller (15-ton) for the lots and a 12-ton padfoot roller along with a trench compactor for the stormwater trench. Compaction testing was performed using a Troxler nuclear density gauge, supplemented by general probing with a 3/8″ diameter probe rod. The density test results indicated that most of the compacted materials met the project requirement of achieving at least 95% of the maximum dry density, in accordance with ASTM D698 (Standard Proctor).

    . Proof-Roll Observation:
    A proof-roll was performed on Lots from #123 to #134 and Lots #48 to #52 using an offroad tandem-axled dump truck. Multiple passes were made across the area. No significant yielding or deflection was observed during the proof-roll.

     

    We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateAminullah Azimi, August 1, 2025
Reviewer Name / DateKenneth Mosman, August 24, 2025