Skip to content

Density Test Report

Date :08/18/2025
Project No :2025C146
Client Company :Davidson Homes, LLC
Arrival Time :08/18/2025 09:45
Onsite Hours :
Name of the Project :Greene Farms Subdivision
Project Location :1451 Highway 113, Cartersville, Georgia
Weather :
Departure Time :08/18/2025
ASEC Technician Name :Solomon Cherie

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/18/2025 1 25.4 89.5 ASECP003 109.2 18.5 82.0 98 D2937 Fail
Location : Lot #47, Elv/Depth :at finished grade
Comment : In-situ moisture contents much higher than optimum. Recommend scarification and aeration followed by recompaction.
08/18/2025 2 20.6 92.6 ASECP002 99.4 22.4 93.2 98 D2937 Fail
Location : Lot #46, Elv/Depth :at finished grade
Comment : In-situ moisture contents much higher than optimum. Recommend scarification and aeration followed by recompaction.
08/18/2025 3 24.2 88.6 ASECP002 99.4 22.4 89.1 98 D2937 Fail
Location : Lot #45, Elv/Depth :at finished grade
Comment : In-situ moisture contents much higher than optimum. Recommend scarification and aeration followed by recompaction.
08/18/2025 4 20.3 87.3 ASECP002 99.4 22.4 87.8 D2937 Pass
Location : Lot #37, Elv/Depth :at finished grade
Comment : In-situ moisture contents much higher than optimum. Recommend scarification and aeration followed by recompaction.
08/18/2025 5 27.6 88.4 ASECP002 99.4 22.4 88.9 98 D2937 Fail
Location : Lot #41, Elv/Depth :at finished grade
Comment : In-situ moisture contents much higher than optimum. Recommend scarification and aeration followed by recompaction.
Technician Signature / DateSolomon Cherie, August 18, 2025
Reviewer Name / DateKenneth Mosman, September 12, 2025