Density Test Report

Date :08/19/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :08/19/2025 9:00
Onsite Hours :07:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :sunny
Departure Time :08/19/2025 16:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/19/2025 1 23.5 111.9 2025-032 SP 94.9 25.0 95.5 95 D6938 Pass
Location : Between MHB9 and MH9, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
08/19/2025 2 24.1 90.7 2025-032 SP 94.9 25.0 95.6 95 D6938 Pass
Location : 10 feet to the north of MHB9, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :30942
08/19/2025 3 22.3 90.7 2025-032 SP 94.9 25.0 95.6 95 D6938 Pass
Location : 12 feet to the south of MH9, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
Technician Signature / DateAminullah Azimi, August 19, 2025
Reviewer Name / DateKenneth Mosman, September 12, 2025