Skip to content

Density Test Report

Date :08/20/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :08/20/2025 13:00
Onsite Hours :04:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :sunny
Departure Time :08/20/2025 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/20/2025 1 22.8 90.4 2025-032 SP 94.9 25.0 95.3 95 D6938 Pass
Location : 45 feet to the east from MH9, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :30942
08/20/2025 2 20.5 90.6 2025-032 SP 94.9 25.0 95.5 95 D6938 Pass
Location : Sewer trench 130 feet to the east of MH8, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :30942
08/20/2025 3 22.2 110.4 2025-032 SP 94.9 25.0 95.2 95 D6938 Pass
Location : Sewer trench 41 feet to the east of MH8, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :30942
08/20/2025 4 22.1 91.0 2025-032 SP 94.9 25.0 95.9 95 D6938 Pass
Location : Sewer trench 18 feet to the east of MH8, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :30942
08/20/2025 5 21 109.9 2025-032 SP 94.9 25.0 95.7 95 D6938 Pass
Location : Sewer trench 50 feet to the east of MH8, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :30942
Technician Signature / DateAminullah Azimi, August 20, 2025
Reviewer Name / DateKenneth Mosman, September 12, 2025