Density Test Report

Date :08/19/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :08/19/2025 09:30
Onsite Hours :07:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Mostly sunny
Departure Time :08/19/2025 16:30
ASEC Technician Name :Safiullah Momand

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/19/2025 1 17.5 110.6 2025-033 SP 104.0 16.2 106.3 95 D6938 Pass
Location : Embankment behind Lot#15 and 16, Elv/Depth :11 feet to finished grade
Comment : Gauge Serial No. :3430
08/19/2025 2 10 106.4 2025-033 SP 104.0 16.2 102.3 95 D6938 Pass
Location : Lot #17, Elv/Depth :1 ft below finished grade
Comment : Gauge Serial No. :3430
08/19/2025 3 9.9 108.7 2025-033 SP 104.0 16.2 95.1 95 D6938 Pass
Location : Lot #18, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :3430
08/19/2025 23 10 104.8 2025-033 SP 104.0 16.2 100.8 100 D6938 Pass
Location : Lot #18, Elv/Depth :at finished grade
Comment : Gauge Serial No. :3430
Technician Signature / DateSafiullah Momand, August 19, 2025
Reviewer Name / DateKenneth Mosman, September 12, 2025