- Home
- Density Test Report Report ID: 84624
- Edit Download Report
Density Test Report
Date :08/20/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :08/20/2025 09:30
Onsite Hours :07:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :08/20/2025 17:00
ASEC Technician Name :Safiullah Momand
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 08/20/2025 | 1 | 19 | 90.5 | 2025-032 SP | 94.9 | 25.0 | 95.4 | 95 | D6938 | Pass |
| Location : | 35 feet away from manhole 8 toward manhole 9 , Elv/Depth :9 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :3430 | |||||||||
| 08/20/2025 | 2 | 16.7 | 94.1 | 2025-032 SP | 94.9 | 25.0 | 99.2 | 95 | D6938 | Pass |
| Location : | 80 feet away from manhole 8 toward manhole 9 , Elv/Depth :9 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :3430 | |||||||||
| 08/20/2025 | 3 | 24 | 93.9 | 2025-032 SP | 94.9 | 25.0 | 98.9 | 95 | D6938 | Pass |
| Location : | 130 feet away from Manhole 9 toward Manhole 8, Elv/Depth :9 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :3430 | |||||||||
| 08/20/2025 | 4 | 20.9 | 93.5 | 2025-032 SP | 94.9 | 25.0 | 98.5 | 95 | D6938 | Pass |
| Location : | 60 feet away from Manhole 9 toward Manhole 8, Elv/Depth :9 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :3430 | |||||||||
Technician Signature / DateSafiullah Momand, August 20, 2025