- Home
- Density Test Report Report ID: 84807
- Edit Download Report
Density Test Report
Date :08/25/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :08/25/2025 10:00
Onsite Hours :07:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :08/25/2025 17:00
ASEC Technician Name :Safiullah Momand
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 08/25/2025 | 1 | 21.2 | 95.3 | 2025-032 SP | 94.9 | 25.0 | 100.4 | 98 | D2937 | Pass |
| Location : | Lot #17 (retest), Elv/Depth :at finished grade | |||||||||
| Comment : | ||||||||||
| 08/25/2025 | 2 | 22.0 | 93.4 | 2025-032 SP | 94.9 | 25.0 | 98.4 | 98 | D2937 | Pass |
| Location : | Lot #18 (retest), Elv/Depth :at finished grade | |||||||||
| Comment : | ||||||||||
| 08/25/2025 | 3 | 20.5 | 94.5 | 2025-032 SP | 94.9 | 25.0 | 99.6 | 98 | D2937 | Pass |
| Location : | Lot #14 (retest), Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | ||||||||||
Technician Signature / DateSafiullah Momand, August 25, 2025
Reviewer Name / DateKenneth Mosman, September 12, 2025