Skip to content

Density Test Report

Date :08/26/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :08/26/2025 9:30
Onsite Hours :07:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :sunny
Departure Time :08/26/2025 16:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/26/2025 1 23.5 90.9 2025-032 SP 94.9 25.0 95.8 95 D6938 Pass
Location : Water storm trench 18 feet to the south of MHC1, Elv/Depth :9 feet below finished grade
Comment : Gauge Serial No. :30942
08/26/2025 2 22.1 91.0 2025-032 SP 94.9 25.0 95.9 95 D6938 Pass
Location : Water storm trench between MHC2 and MHC3, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :30942
08/26/2025 3 23.3 92.3 2025-032 SP 94.9 25.0 97.3 95 D6938 Pass
Location : Sewer trench 13 feet to the north of MH6, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
08/26/2025 4 19.7 96.2 2025-031 SP 101.0 20.7 95.2 95 D6938 Pass
Location : Sewer trench 15 feet to the south of MH6A, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
Technician Signature / DateAminullah Azimi, August 26, 2025
Reviewer Name / DateKenneth Mosman, September 12, 2025