Daily Field Report

Date :08/27/2025
Project No :2025C219
Client Company :Davidson
Arrival Time :08/27/2025 9:00
Onsite Hours :06:00
Name of the Project :Hickory Bluffs, Retaining Wall
Project Location :Canton
Weather :sunny
Departure Time :08/27/2025 15:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

On this day, test pit investigations were conducted by the contractor on Lots #1 through #29. For each lot, a total of five test pits were excavated: one at each of the four corners and one in the center. Each pit was excavated to a depth of approximately 24 inches to assess subsurface conditions for potential rock presence and refusal concerns related to future plumbing and footing installations.

During the inspection, no refusal or obstructions were observed at the excavated depth. While rocks were encountered in several locations, they appeared to be manageable and are expected to be removable during the footing excavation process. These conditions are not expected to pose a significant issue for construction activities.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateAminullah Azimi, August 27, 2025
Reviewer Name / DateKenneth Mosman, September 12, 2025