Density Test Report
Date :08/28/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :08/28/2025 09:00
Onsite Hours :06:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :08/28/2025 15:00
ASEC Technician Name :Safiullah Momand
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 08/28/2025 | 1 | 20.6 | 96.6 | 2025-031 SP | 101.0 | 20.7 | 95.6 | 95 | D2937 | Pass |
| Location : | Sewer line North side of Manhole 5 about 120 ft , Elv/Depth :6 feet below finished grade | |||||||||
| Comment : | ||||||||||
| 08/28/2025 | 2 | 14.9 | 99.0 | 2025-031 SP | 101.0 | 20.7 | Check | |||
| Location : | Lot #6, Elv/Depth :1 foot below finished grade | |||||||||
| Comment : | ||||||||||
| 08/28/2025 | 34 | 17.6 | 98.0 | 2025-031 SP | 101.0 | 20.7 | 97.0 | 95 | D2937 | Pass |
| Location : | Lot#6, Elv/Depth :1 foot below finished grade | |||||||||
| Comment : | ||||||||||
Technician Signature / DateSafiullah Momand, August 28, 2025
Reviewer Name / DateKenneth Mosman, September 17, 2025