Density Test Report

Date :08/28/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :08/28/2025 09:00
Onsite Hours :06:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :08/28/2025 15:00
ASEC Technician Name :Safiullah Momand

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/28/2025 1 20.6 96.6 2025-031 SP 101.0 20.7 95.6 95 D2937 Pass
Location : Sewer line North side of Manhole 5 about 120 ft , Elv/Depth :6 feet below finished grade
Comment :
08/28/2025 2 14.9 99.0 2025-031 SP 101.0 20.7 Check
Location : Lot #6, Elv/Depth :1 foot below finished grade
Comment :
08/28/2025 34 17.6 98.0 2025-031 SP 101.0 20.7 97.0 95 D2937 Pass
Location : Lot#6, Elv/Depth :1 foot below finished grade
Comment :
Technician Signature / DateSafiullah Momand, August 28, 2025
Reviewer Name / DateKenneth Mosman, September 17, 2025