Density Test Report

Date :09/08/2025
Project No :2025G234
Client Company :Artisan
Arrival Time :09/08/2025 08:00
Onsite Hours :07:30
Name of the Project :NW-7 Hills, Unit 3, PH 13 (Site #2)
Project Location :Dallas
Weather :Sunny
Departure Time :09/08/2025 15:30
ASEC Technician Name :Austin Coleman

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/08/2025 1 14.1 97.5 FP-1 0 Check
Location : Between Manhole A3 and A4, Elv/Depth :-6.0 feet
Comment : OM: 15.0% MDD: 102.0
09/08/2025 2 15.1 94.1 FP-1 0 Infinity D6938 Pass
Location : Between Manhole A3 and A4, Elv/Depth :-6.0
Comment : Compaction failed on the proctor the check plug found Gauge Serial No. :29588
09/08/2025 3 15.2 97.9 FP-1 0 Infinity D6938 Pass
Location : Between Manhole A3 and A4, Elv/Depth :-6.0
Comment : Re check passed, 96% compaction Gauge Serial No. :29588
09/08/2025 4 15.9 99.7 FP-1 0 Infinity D6938 Pass
Location : Between Manhole A4 and A5, Elv/Depth :-5.0
Comment : Compaction is passing at 97.7% Gauge Serial No. :29588
Check
Location : , Elv/Depth :
Comment :
Technician Signature / DateAustin Coleman, September 8, 2025