Skip to content

Daily Field Report

Date :09/08/2025
Project No :2025C160
Client Company :Artisan
Arrival Time :09/08/2025 08:00
Onsite Hours :04:00
Name of the Project :Rockmart Township - 115 Felton Drive
Project Location :Rockmart
Weather :Sunny
Departure Time :09/08/2025 12:00
ASEC Technician Name :Sean Willett

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.

Our ASEC representative was on site as requested by the contractor (Wilbanks) for the observation/testing of the placement of fill/backfill. The contractor is placing approximately 3 in to 6 in of fill for final grade across Lots #160 through #178. Fill was compacted with a sheep-foot roller and then rolled in with a loaded off-road truck. All test results were provided to the contractor.

Contractors are expanding/redoing the headwall located at main entrance way.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

headwall at main entrance

Technician Signature / DateSean Willett, September 8, 2025
Reviewer Name / DateKenneth Mosman, October 15, 2025