Skip to content

Density Test Report

Date :09/09/2025
Project No :2025C216
Client Company :Artisan
Arrival Time :09/09/2025 08:30
Onsite Hours :08:30
Name of the Project :NW (Lots) Unit 4 PH 1A & 1B
Project Location :Dallas
Weather :sunny
Departure Time :09/09/2025 17:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/09/2025 1 16.1 93.5 2025-032 SP 94.9 25.0 98.5 98 D6938 Pass
Location : SSMH C3, Elv/Depth :at finished grade
Comment : Field proctor: 102.0 pcf maximum dry density @ 15% optimum moisture content. Gauge Serial No. :77-19952
09/09/2025 2 19.3 94.7 2025-032 SP 94.9 25.0 99.8 98 D6938 Pass
Location : SSMH C4, Elv/Depth :at finished grade
Comment : Field proctor: 102.0 pcf maximum dry density @ 15% optimum moisture content. Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, September 9, 2025
Reviewer Name / DateKenneth Mosman, October 16, 2025