Daily Field Report

Date :09/11/2025
Project No :2024C217
Client Company :Artisan
Arrival Time :09/11/2025 11:00
Onsite Hours :02:30
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :Sunny
Departure Time :09/11/2025 13:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed:

As requested, our representative was on site and observed proof-rolling of subgrade soils at the entrance and exit way to Seven Hills amenities. The proof-roll was observed with members from Artisan, Paulding County, Thompson Grading and the paving contractor using a loaded tandem dump truck making two passes over all areas. Several isolated areas were observed having moderate to severe movement with rutting. Due to in place utilities the following recommendations were made for subgrade repairs.

1. Undercut the decel and accel lanes -6″and replace with additional GAB stone after Tensor stabilization fabric has been installed over the entire area. The total depth of GAB stone should be 18″ to be placed in one thickened lift with sufficient water placed atop the GAB then compacting to 98% modified or 100% standard.

2. Following subgrade undercutting of -6″ care should be taken to keep equipment off when pushing GAB stone over fabric.

3. Undercut entrance lane -4″ and installing Tensor fabric and additional GAB stone keeping equipment off the undercut subgrade layer.

4. Undercut exit lane -6″ and installing Tensor fabric and additional GAB stone.

Note: Recommendation to place full depth GAB stone is due to the lightweight silty soils that are high in in-situ moisture content.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Proof roll of sub grade at Decel lane severe rutting

Proof roll at Accel lane severe rutting

Proof roll at entrance lane moderate movement

Technician Signature / DateClyde Smith, September 11, 2025
Reviewer Name / DateKenneth Mosman, September 15, 2025