- Density Test Report Report ID: 85457
- Edit Download Report
Density Test Report
Date :08/29/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :08/29/2025 10:00
Onsite Hours :05:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :08/29/2025 15:30
ASEC Technician Name :Safiullah Momand
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 08/29/2025 | 1 | 18.3 | 89.0 | 2025-031 SP | 101.0 | 20.7 | 88.1 | 98 | D6938 | Fail |
| Location : | 45ft west of Manhole 6, Elv/Depth :at finished grade | |||||||||
| Comment : | Recompaction required | Gauge Serial No. :3440 | ||||||||
| 08/29/2025 | 2 | 16.7 | 89.3 | 2025-031 SP | 101.0 | 20.7 | 88.4 | 98 | D6938 | Fail |
| Location : | 120 ft west of Manhole 6, Elv/Depth :at finished grade | |||||||||
| Comment : | Recompaction required | Gauge Serial No. :3440 | ||||||||
| 08/29/2025 | 3 | 21.7 | 96.4 | 2025-031 SP | 101.0 | 20.7 | 95.4 | 98 | D6938 | Fail |
| Location : | 300 ft west side of Manhole 6A, Elv/Depth :at finished grade | |||||||||
| Comment : | Recompaction required | Gauge Serial No. :3440 | ||||||||
Technician Signature / DateSafiullah Momand, August 29, 2025
Reviewer Name / DateKenneth Mosman, September 17, 2025