Density Test Report

Date :09/03/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :09/03/2025 9:00
Onsite Hours :07:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :sunny
Departure Time :09/03/2025 16:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/03/2025 1 17.1 112.5 2025-031 SP 101.0 20.7 95.1 95 D6938 Pass
Location : North trench 15 feet to the south of MH5, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
09/03/2025 2 17.1 96.1 2025-031 SP 101.0 20.7 95.1 95 D6938 Pass
Location : Between MH5 and MH5A, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :30942
09/03/2025 3 17.3 96.1 2025-031 SP 101.0 20.7 95.1 95 D6938 Pass
Location : Sewer trench 15 feet to the south of MH5A, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :30942
09/03/2025 4 17.6 114.0 2025-031 SP 101.0 20.7 95.9 95 D6938 Pass
Location : Sewer trench 10 feet to the north of MH5A, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
09/03/2025 5 22.4 96.4 2025-031 SP 101.0 20.7 95.4 95 D6938 Pass
Location : Sewer trench 8 feet to the south of MHA3, Elv/Depth :14 feet below finished grade
Comment : Gauge Serial No. :30942
Technician Signature / DateAminullah Azimi, September 3, 2025
Reviewer Name / DateKenneth Mosman, September 17, 2025