Density Test Report

Date :09/04/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :09/04/2025 9:30
Onsite Hours :08:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :sunny
Departure Time :09/04/2025 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/04/2025 1 16.5 112.4 2025-031 SP 101.0 20.7 95.5 95 D6938 Pass
Location : Lot #9, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :30942
09/04/2025 2 16.7 96.3 2025-031 SP 101.0 20.7 95.3 95 D6938 Pass
Location : Lot #8, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :30942
09/04/2025 3 17.1 112.7 2025-031 SP 101.0 20.7 95.2 95 D6938 Pass
Location : Lot #10, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :30942
09/04/2025 4 15.8 96.7 2025-031 SP 101.0 20.7 95.7 95 D6938 Pass
Location : Lot #11, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
09/04/2025 5 12.6 99.5 2025-033 SP 104.0 16.2 95.7 95 D6938 Pass
Location : Lot #7, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :30942
Technician Signature / DateAminullah Azimi, September 4, 2025
Reviewer Name / DateKenneth Mosman, October 16, 2025