Density Test Report
Date :09/23/2025
Project No :2025C216
Client Company :Artisan
Arrival Time :09/23/2025 10:00
Onsite Hours :
Name of the Project :NW (Lots) Unit 4 PH 1A & 1B
Project Location :Dallas
Weather :Overcast
Departure Time :09/23/2025
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 09/23/2025 | 1 | 19.0 | 83.1 | 2025-031 SP | 101.0 | 20.7 | 82.3 | 98 | D2937 | Fail |
| Location : | SSMH pipeline 9A, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Recompaction required. | |||||||||
| 09/23/2025 | 2 | 6.4 | 94.1 | 2025-031 SP | 101.0 | 20.7 | 93.2 | 98 | D2937 | Fail |
| Location : | SSMH pipeline 9a, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Recompaction required. | |||||||||
Technician Signature / DateSean Willett, September 23, 2025
Reviewer Name / DateKenneth Mosman, October 16, 2025