Daily Field Report

Date :09/23/2025
Project No :2025C224
Client Company :C. W. MATTHEWS CONTRACTING CO., INC.
Arrival Time :09/22/2025 16:00
Onsite Hours :10:00
Name of the Project :PDK Airport - RUNWAY 3R-21L KEEL REPLACEMENT
Project Location :PDK AIRPORT, DEKALB County, GA
Weather :
Departure Time :09/23/2025 02:00
ASEC Technician Name :Solomon Cherie

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

During the night concrete placement of 3R-21L Runway was performed and a total of 1130 yards of concrete was placed.

The concrete was batched from the temporary CWM mixer plant at the PDK Airport.

Five sampled tests at random intervals were performed to check the concrete & air, temperatures, slump, air content and unit weight.  Results show that concrete placed were within job specification ranges.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Picture showing concrete pouring at 3Rr-21L runway

The crew and the complex pouring machines

Data logger inserted at the concrete for future temperature monitoring

Technician Signature / DateSolomon Cherie, September 23, 2025
Reviewer Name / DateKenneth Mosman, October 10, 2025