Skip to content

Daily Field Report

Date :09/23/2025
Project No :2024C217
Client Company :Artisan
Arrival Time :09/23/2025 08:30
Onsite Hours :03:30
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :Sunny
Departure Time :09/23/2025 12:00
ASEC Technician Name :Clyde Smith

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

On the above date our representative of AS engineering was on site to observe exploratory excavations to locate the existing colonial gas pipelines crossing Seven Hills Boulevard at two locations.  The HVAC contractor SHV (Southern Hydro Vac) performed the excavations which was also observed by a member from Colonial Pipeline, these were the findings listed below.

Location #1 = N1462805.219 E2106494.754, pipe encountered at elevation 940.61 (-7.9′) below existing grade.

Location #2 = N1462819.854 E2106509.812, pipe encountered at elevation 940.346 (-8.7′) below existing grade. The excavations were refilled with soil after observations were made and the sod replaced.  The locations were established by Gaskins LeCraw survey team.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

 

Technician Signature / DateClyde Smith, September 23, 2025
Reviewer Name / DateKenneth Mosman, September 24, 2025