Density Test Report

Date :09/08/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :09/08/2025 08:00
Onsite Hours :9:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :09/08/2025 17:00
ASEC Technician Name :Austin Coleman

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/08/2025 1 14.1 97.5 FP-1 0 Check
Location : Pipe backfill from A3-A5, Elv/Depth :
Comment : Feild proctor is 102.0 pcf maximum dry density and 15% optimum moisture content.
09/08/2025 2 14.9 98.2 2025-031 SP 101.0 20.7 97.2 95 D6938 Pass
Location : A3-A4, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :29588
09/08/2025 3 15.9 99.7 2025-031 SP 101.0 20.7 98.7 95 D6938 Pass
Location : A4-A5, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :29588
Technician Signature / DateAustin Coleman, September 8, 2025
Reviewer Name / DateKenneth Mosman, October 16, 2025