Density Test Report

Date :09/17/2025
Project No :2025C215
Client Company :Artisan
Arrival Time :09/17/2025 08:00
Onsite Hours :07:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :09/17/2025 15:30
ASEC Technician Name :Austin Coleman

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/17/2025 1 12.3 96.3 2025-031 SP 101.0 20.7 95.3 98 D2937 Fail
Location : A9-A10, Elv/Depth :at finished grade
Comment : Recompaction required.
09/17/2025 2 13.1 99.2 2025-031 SP 101.0 20.7 98.2 98 D2937 Pass
Location : A10-A11, Elv/Depth :at finished grade
Comment :
Technician Signature / DateAustin Coleman, September 17, 2025
Reviewer Name / DateKenneth Mosman, October 16, 2025