Daily Field Report

Date :10/10/2025
Project No :2024C217
Client Company :Artisan
Arrival Time :10/10/2025 12:00
Onsite Hours :01:30
Name of the Project :Naturewalk - 7 Hills Amenities
Project Location :Dallas
Weather :cloudy
Departure Time :10/10/2025 13:30
ASEC Technician Name :Clyde Smith

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Our representative was on site and observed proof-rolling of the subbase stone for the repair deficient asphalt areas on Mountain Ash Lane. The proof-roll was also observed by the Paulding County inspector and the grading contractor using a loaded tandem dump truck loaded with 19 tons. All areas appeared stable under proof-roll traffic with no severe movement which is now suitable for asphalt paving. Repair areas listed below:

1.Between house #148 & 132

2.Between house #170 &156

3.Between house #186 #170

4.Between house #223 &207 (isolated strip 18″x 38″) with movement, recommended clip and add additional asphalt.

5.Between house #171 & 189

6.Between house #145 &155

7.Between house #123 & 141

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Small isolated area for repair

Technician Signature / DateClyde Smith, October 10, 2025
Reviewer Name / DateKenneth Mosman, October 15, 2025