Skip to content

Density Test Report

Date :10/09/2025
Project No :2025C245
Client Company :Bearing Engineering
Arrival Time :10/09/2025 07:30
Onsite Hours :07:30
Name of the Project :Dunkin Donuts 2025
Project Location :US 29, Palmetto, GA
Weather :Sunny
Departure Time :10/09/2025 15:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
10/09/2025 1 16.9 99.4 2 103.6 17.1 95.9 95 D6938 Pass
Location : test location #6 retaining wall, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :77-19952
10/09/2025 2 16 104.7 2 103.6 17.1 101.1 95 D6938 Pass
Location : test location #5 retaining wall, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :77-19952
10/09/2025 3 15.5 104.2 2 103.6 17.1 100.6 95 D6938 Pass
Location : testing location #4 retaining wall, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :77-19952
10/09/2025 4 16.2 101.1 2 103.6 17.1 97.6 95 D6938 Pass
Location : testing location #3 retaining wall, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :77-19952
10/09/2025 5 16.3 98.8 2 103.6 17.1 95.4 95 D6938 Pass
Location : testing location #3-#2 retaining wall, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :77-19952
10/09/2025 6 16.2 98.0 2 103.6 17.1 94.6 95 D6938 Fail
Location : testing location #2 retaining wall, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, October 9, 2025
Reviewer Name / DateKenneth Mosman, October 13, 2025