Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
On the above date our representative was on site to observe the grading contractor continue placing fill for building Lot #18 and complete subgrade prep at building Lots #12 thru #17 by proof-rolling the lots using a loaded off-road dump truck making two passes over all areas. The subgrade soils appeared stable under traffic and was approved for continued fill placement.
The Erosion contractor (Valor) continued grassing building lots.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Proof rolling building lots



Fill placement at building lot#18


Slope matting

Erosion seeding