Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.
Our ASEC representative was on site for the observation/testing of the placement of fill/backfill. There was approximately 2 in to 4 in of soil placed in the roadway since the last tested lift. There are surveyor stakes around the roadway that show approximately 2 ft of fill remaining to be placed. No contractors were present onsite at this time. Our representative will come back once the filling of roadway is completed for final grade testing.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.