- Home
- Concrete Test Report Report ID: 87150
- Edit Download Report
Concrete Test Report
Date :10/08/2025
Project No :2025C245
Client Company :Bearing Engineering
Arrival Time :10/08/2025 06:00
Onsite Hours :9:30
Name of the Project :Dunkin Donuts 2025
Project Location :US 29, Palmetto, GA
Weather :Overcast
Departure Time :10/08/2025 15:30
ASEC Technician Name :Sean Willett
Concrete Placement Information
Location(S):
N/A
Testing:
1 Set of concrete specimens (10 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Specimen
Pick Up: 1 Sets of concrete specimens/ 10 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 1 Sets of concrete specimens/ 10 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:
Field Test Data
Specimen Type Selection : Cylinder
Set Number :A
Date Sampled :10/08/2025
Sampled By :Sean Willett
Contractor :Bearing Engineering
Truck Number :62382206
Time Batched :06:24
Location of Placement :Monolithic slab on grade
Number of samples cast :10
Ambient Temperature (°f) :69
Slump (in.) :4.5
Water added (gal.) :N/A
Laboratory Number :2025-049
Time Sampled :08:00
Weather Condition :Overcast
Concrete Supplier :Quikrete
Mix ID :30CAC199
Quantity of Load (cu. yd.) :9
Sample Cast :1
Specified Strength :3000
Concrete Temperature(°f) :82
Air Content (%) :4.0
Unit Weight (pcf) :142.0
Strength Test Results
| Specimen Number | Scheduled Test Date | Date Tested | Age (days) | Dia(in.) | Area (sq in.) | Maximum Loads (lbf) | Strength (lbs) | % Design Strength | Type of Fracture |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 10/15/2025 | 10/15/2025 | 7 | 3.98 | 12.44 | 39102 | 3140 | Infinity | Type 6 |
| 2 | 10/15/2025 | 10/15/2025 | 7 | 3.99 | 12.50 | 41972 | 3360 | Infinity | Type 5 |
| 3 | 10/15/2025 | 10/15/2025 | 7 | 3.99 | 12.52 | 41636 | 3330 | Infinity | Type 5 |
| 4 | 11/05/2025 | 11/05/2025 | 28.041666666666668 | 3.98 | 12.42 | 61080 | 4920 | 164.0 | Type 2 |
| 5 | 11/05/2025 | 11/05/2025 | 28.041666666666668 | 3.98 | 12.42 | 59339 | 4780 | 159.3 | Type 5 |
| 6 | 11/05/2025 | 11/05/2025 | 28.041666666666668 | 3.99 | 12.48 | 64512 | 5170 | 172.3 | Type 5 |
| 7 | 12/03/2025 | 12/03/2025 | 56.041666666666664 | 3.97 | 12.40 | 63876 | 5150 | 171.7 | Type 5 |
| 8 | 12/03/2025 | 12/03/2025 | 56.041666666666664 | 3.98 | 12.46 | 63062 | 5060 | 168.7 | Type 5 |
| 9 | 12/03/2025 | 12/03/2025 | 56.041666666666664 | 3.98 | 12.44 | 64493 | 5180 | 172.7 | Type 2 |
| 10 | 12/03/2025 | 12/03/2025 | 56.041666666666664 | 3.98 | 12.46 | 65296 | 5240 | 174.7 | Type 2 |
UNLESS OTHERWISE SPECIFIED, TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM TEST METHODS C31, C39, C138, C143, C173, AND C1064. FRACTURE TYPE INDICATED BY NUMBER.
(Type 1) Cone (Type 2) Cone-split (Type 3) Vertical (Type 4) Shear (Type 5) Edge Fracture (Type 6) Pointed
Technician Signature / DateCatherine Lanier, October 8, 2025