Skip to content

Daily Field Report

Date :11/13/2025
Project No :2025C260
Client Company :Artisan
Arrival Time :11/13/2025
Onsite Hours :
Name of the Project :NW (PHASE 2) Parkway Extension
Project Location :Dallas
Weather :sunny
Departure Time :11/13/2025
ASEC Technician Name :Russell Hendrix

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Site Observations:

Upon arrival, a meeting was held with Rick, the grading foreman, who stated that soil from the blasted area was being placed on the slopes (see photo).

Access along the main road was impassable due to the presence of soil stockpiles and excavators operating in the area.

Equipment observed on site included:

  • Three off-road dump trucks transporting soil (see photo)

  • Two excavators loading material

  • One Komatsu 51 PXI dozer spreading soil

  • One Caterpillar 815 ride-on sheepsfoot roller compacting the placed material

No further observations were made following this inspection.

Remarks:

Grading and compaction operations were ongoing with appropriate heavy equipment in use.

Slope area off road dump truck

compactor

Location of low slope area

Technician Signature / DateRussell Hendrix, November 13, 2025
Reviewer Name / DateKenneth Mosman, November 16, 2025