Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
All conditions at the site were observed to be satisfactory. The rebars were properly supported and not touching the ground. The reinforcement grid was inspected and found to be in good condition.
Two Dynamic Cone Penetrometer (DCP) tests were performed at the two corner locations of the lot. For each test, soil was augered and removed up to approximately 1 foot depth. The DCP test was started 1.75 inches above ground level, and the number of blows was recorded for every foot of penetration up to 4 feet depth.
DCP Test Results
Location: Lot 64, Pod 21 (Northeast)
Soil Type: Red Silty Sand
Test 1:
-
1st foot – 9 blows
-
2nd foot – 9 blows
-
3rd foot – 8 blows
-
4th foot – 9 blows
Test 2:
-
1st foot – 11 blows
-
2nd foot – 10 blows
-
3rd foot – 9 blows
-
4th foot – 9 blows
Location: Lot 65, Pod 21 (Northeast)
Soil Type: Red Silty Sand
Test 1:
-
1st foot – 9 blows
-
2nd foot – 11 blows
-
3rd foot – 11 blows
-
4th foot – 10 blows
Test 2:
-
1st foot – 9 blows
-
2nd foot – 9 blows
-
3rd foot – 8 blows
-
4th foot – 9 blows
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.