Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
On the above date the writer made a site visit to observe placement of embankment slope fill using stripped topsoil from parkway mixed with structure fill at elevations 845, 836 and 829. The fill placement was suitable as per job plans and specifications. The fill was spread with a dozer and compacted with a 815 sheep-foot roller.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Fill placement at slope embankment ,topsoil and structural fill .