Skip to content

Density Test Report

Date :12/01/2025
Project No :2025C211
Client Company :Pulte
Arrival Time :12/01/2025 07:30
Onsite Hours :05:30
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :12/01/2025 13:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/01/2025 1 20.9 91.8 FP 2 100.0 18.5 91.8 95 D6938 Fail
Location : lots 8 -13 and 52 - 60 deep fill area, Elv/Depth :1486-1487
Comment : will retest Gauge Serial No. :77-19952
12/01/2025 2 (retest) 18.0 95.2 FP 2 100.0 18.5 95.2 95 D6938 Pass
Location : lots 8 -13 and 52 - 60 deep fill area, Elv/Depth :1486-1487
Comment : Gauge Serial No. :77-19952
12/01/2025 3 17.8 100.5 FP 2 100.0 18.5 100.5 95 D6938 Pass
Location : lots 8 -13 and 52 - 60 deep fill area, Elv/Depth :1486-1487
Comment : Gauge Serial No. :77-19952
12/01/2025 moisture check 18.0 0.0 Check
Location : lots 8 -13 and 52 - 60 deep fill area, Elv/Depth :1486-1487
Comment : inplace moisture check for fill used on lots 8-13 and 52-60
Technician Signature / DateSean Willett, December 1, 2025