Skip to content

Density Test Report

Date :12/11/2025
Project No :2025C211
Client Company :Pulte
Arrival Time :12/11/2025 07:30
Onsite Hours :04:30
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :12/11/2025 12:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/11/2025 1 18.1 95.5 FP 2 100.0 18.5 95.5 95 D6938 Pass
Location : Commercial lots by front pond, Elv/Depth :1516
Comment : Gauge Serial No. :77-19952
12/11/2025 2 17.2 111.8 FP 2 100.0 18.5 111.8 95 D6938 Pass
Location : Commercial lots by front pond, Elv/Depth :1516
Comment : Gauge Serial No. :77-19952
12/11/2025 3 19.0 101.7 FP 2 100.0 18.5 101.7 95 D6938 Pass
Location : Commercial lots by front pond, Elv/Depth :1516
Comment : Gauge Serial No. :77-19952
12/11/2025 4 15.1 93.2 FP 2 100.0 18.5 93.2 95 D6938 Fail
Location : Lots #8-13 and #52 - 60 (deep fill area), Elv/Depth :1492-1493
Comment : will retest Gauge Serial No. :77-19952
12/11/2025 5 retest 16.3 99.7 FP 2 100.0 18.5 99.7 95 D6938 Pass
Location : Lots #8-13 and #52 - 60 (deep fill area), Elv/Depth :1492-1493
Comment : Gauge Serial No. :77-19952
12/11/2025 6 14.0 101.3 FP 2 100.0 18.5 101.3 95 D6938 Pass
Location : Lots #8-13 and #52 - 60 (deep fill area), Elv/Depth :1492-1493
Comment : Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, December 11, 2025
Reviewer Name / DateKenneth Mosman, January 29, 2026