Skip to content

Density Test Report

Date :12/13/2025
Project No :2025C211
Client Company :Pulte
Arrival Time :12/12/2025 07:30
Onsite Hours :07:30
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :12/12/2025 15:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/12/2025 1 22.1 92.3 FP 2 100.0 18.5 92.3 95 D6938 Fail
Location : Commercial lot by front pond, Elv/Depth :1520
Comment : Gauge Serial No. :77-19952
12/12/2025 2 (retest) 20.9 97.9 FP 2 100.0 18.5 97.9 95 D6938 Pass
Location : Commercial lot by front pond, Elv/Depth :1520
Comment : Gauge Serial No. :17-19952
12/12/2025 3 17.9 107.0 2025-055 107.3 15.5 99.7 95 D6938 Pass
Location : Lot #8-13 and #52-60 area, Elv/Depth :1496-1497
Comment : mixture of material in this lift Gauge Serial No. :77-19952
12/12/2025 4 18.1 97.8 FP 2 100.0 18.5 97.8 95 D6938 Pass
Location : Lot #8-13 and #52-60 area, Elv/Depth :1496-1497
Comment : Gauge Serial No. :77-19952
12/12/2025 5 18.2 97.9 FP 2 100.0 18.5 97.9 95 D6938 Pass
Location : Pipeline BA-4 commercial lot, Elv/Depth :1515
Comment : Gauge Serial No. :77-19952
12/12/2025 6 20.2 96.4 FP 2 100.0 18.5 96.4 95 D6938 Pass
Location : Pipeline BA-4 commercial lot, Elv/Depth :1515
Comment : Gauge Serial No. :77-19952
12/12/2025 7 18.2 98.4 FP 2 100.0 18.5 98.4 95 D6938 Pass
Location : Commercial lot by front pond, Elv/Depth :1521-1522
Comment : Gauge Serial No. :77-19952
12/12/2025 8 16.6 99.8 FP 2 100.0 18.5 99.8 95 D6938 Pass
Location : Commercial lot by front pond, Elv/Depth :1521-1522
Comment : Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, December 13, 2025
Reviewer Name / DateKenneth Mosman, January 30, 2026