Skip to content

Daily Field Report

Date :12/19/2025
Project No :2025C216
Client Company :Artisan
Arrival Time :12/19/2025 11:00
Onsite Hours :06:00
Name of the Project :NW (Lots) Unit 4 PH 1A & 1B
Project Location :Dallas
Weather :cloudy
Departure Time :12/19/2025 17:00
ASEC Technician Name :Clyde Smith

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

On the above date out representative was on site to observe the pipe contractor continue installing 8″PVC sanitary sewer line between manholes #10 and 11, laying 100′ lineal feet and begin backfilling operations. The pipe was bedded on No. #57 stone and backfilled along the sides of the pipe. The contractor is waiting on additional compacting equipment to be delivered to site.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

100' of 8" pvc sanitary sewer pipe installed between manhole #10 and 11 bedding on #57 stone

Technician Signature / DateClyde Smith, December 19, 2025
Reviewer Name / DateKenneth Mosman, January 30, 2026