Density Test Report

Date :12/23/2025
Project No :2025C269
Client Company :Lewis Contracting
Arrival Time :12/23/2025 08:00
Onsite Hours :9:30
Name of the Project :Main St. & First Ave. - Mixed-use
Project Location :Lilburn
Weather :sunny
Departure Time :12/23/2025 17:30
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/23/2025 1 25.2 82.3 2025-057 92.1 25.7 89.4 95 D2937 Fail
Location : Building #15, Elv/Depth :1 foot below finished grade
Comment : Top soil concentration mixed in with structural fill.
12/23/2025 2 26.3 85.1 2025-059 88.7 22.0 95.9 95 D2937 Pass
Location : Building #15, Elv/Depth :1 foot below finished grade
Comment : After removing top soil and replacement/recompaction.
Technician Signature / DateSamara Simha Reddy Kandi, December 23, 2025
Reviewer Name / DateKenneth Mosman, January 30, 2026