Density Test Report
Date :12/24/2025
Project No :2025C216
Client Company :Artisan
Arrival Time :12/24/2025 07:00
Onsite Hours :05:00
Name of the Project :NW (Lots) Unit 4 PH 1A & 1B
Project Location :Dallas
Weather :Sunny
Departure Time :12/24/2025 12:00
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 12/24/2025 | 1 | 15.0 | 110.3 | 2025-035 SP | 107.8 | 13.0 | 102.3 | 95 | D6938 | Pass |
| Location : | Pipeline 11 to 12, Elv/Depth :2 to 3 feet below finished grade | |||||||||
| Comment : | blasted rock present | Gauge Serial No. :77-19952 | ||||||||
| 12/24/2025 | 2 | 15.2 | 109.1 | 2025-035 SP | 107.8 | 13.0 | 101.2 | 95 | D6938 | Pass |
| Location : | Pipeline 11 to 12, Elv/Depth :2 to 3 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :77-19952 | |||||||||
Technician Signature / DateSean Willett, December 24, 2025
Reviewer Name / DateKenneth Mosman, February 02, 2026