As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
On the above date our representative was on site to observe the grading contractor continue placing fill for the slope embankment and building Lots #37 thru 41. The contractor also continued to encounter rock at building Lots #38 and 39 approximately five feet above finished grade. Density tests were performed at elevation – 10′ to -12′ below subgrade using a Troxler Nuclear gauge model 3430, serial no. 91643. Compaction results were in compliance with job specifications. The blasting contractor was on site today and continued test rock drilling. Severe erosion has occurred at sanitary sewer line on Naturewalk parkway requiring recompacting efforts due to last heavy rain event.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Fill placement at building lots

Performing density tests

Rock excavation at lot #38

Erosion at Nature Walk parkway


Rock encountered at lot #38