Density Test Report

Date :01/16/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :01/16/2026 08:30
Onsite Hours :08:30
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :Sunny cold
Departure Time :01/16/2026 17:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/16/2026 1 17.1 99.8 2025-033 SP 104.0 16.2 96.0 95 D6938 Pass
Location : Building Lot #40, Elv/Depth :4.5 feet below finished grade
Comment : Gauge Serial No. :91643
01/16/2026 2 17.9 100.3 2025-033 SP 104.0 16.2 96.4 95 D6938 Pass
Location : Building Lot #39, Elv/Depth :4.5 feet below finished grade
Comment : Gauge Serial No. :91643
01/16/2026 3 11.5 103.4 2025-035 SP 107.8 13.0 95.9 95 D6938 Pass
Location : Building Lot #41, Elv/Depth :2.5 feet below finished grade
Comment : Gauge Serial No. :91643
01/16/2026 4 11.4 104.8 2025-035 SP 107.8 13.0 97.2 95 D6938 Pass
Location : Building Lot #39, Elv/Depth :2.5 feet below finished grade
Comment : Gauge Serial No. :91643
01/16/2026 5 17.7 100.4 2025-033 SP 104.0 16.2 96.5 95 D6938 Pass
Location : Building Lot #37, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :91643
01/16/2026 6 18.9 98.3 2025-031SP 101.0 20.7 97.3 95 D6938 Pass
Location : Building Lots #61 through #59, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :91643
01/16/2026 7 19.7 98.7 2025-031SP 101.0 20.7 97.7 95 D6938 Pass
Location : Building Lots #61 through #59, Elv/Depth :8.5 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, January 16, 2026