- Home
- Density Test Report Report ID: 89253
- Edit Download Report
Density Test Report
Date :01/17/2026
Project No :2025C215
Client Company :Artisan
Arrival Time :01/17/2026 08:30
Onsite Hours :08:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :cloudy
Departure Time :01/17/2026 17:00
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 01/17/2026 | 1 | 12.4 | 105.7 | 2025-035 SP | 107.8 | 13.0 | 98.1 | 95 | D6938 | Pass |
| Location : | 30" RCP storm between D9 and D10, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 01/17/2026 | 2 | 12.7 | 103.7 | 2025-035 SP | 107.8 | 13.0 | 96.2 | 95 | D6938 | Pass |
| Location : | 30" RCP storm between D9 and D10, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 01/17/2026 | 3 | 11.2 | 104.2 | 2025-035 SP | 107.8 | 13.0 | 96.7 | 95 | D6938 | Pass |
| Location : | 30" RCP storm between D9 and D10, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 01/17/2026 | 4 | 12.2 | 104.9 | 2025-035 SP | 107.8 | 13.0 | 97.3 | 95 | D6938 | Pass |
| Location : | 30" RCP storm between D9 and D10, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, January 17, 2026
Reviewer Name / DateKenneth Mosman, February 04, 2026
