Density Test Report

Date :01/15/2026
Project No :2025C211
Client Company :Pulte
Arrival Time :01/15/2026 07:00
Onsite Hours :9:00
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :01/15/2026 16:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/15/2026 1 15.9 98.1 FP 2 100.0 18.5 98.1 95 D6938 Pass
Location : Retaining wall #5, Elv/Depth :Bottom of wall finished grade
Comment : Gauge Serial No. :77-19952
01/15/2026 2 21.6 99.4 FP 2 100.0 18.5 99.4 95 D6938 Pass
Location : Retaining wall #5, Elv/Depth :1 basket
Comment : Gauge Serial No. :77-19952
01/15/2026 3 23.2 91.9 FP 2 100.0 18.5 91.9 95 D6938 Fail
Location : Retaining wall #5, Elv/Depth :2 baskets
Comment : will retest Gauge Serial No. :77-19952
01/15/2026 4 retest 21.9 96.0 FP 2 100.0 18.5 96.0 95 D6938 Pass
Location : Retaining wall #5, Elv/Depth :2 baskets
Comment : Gauge Serial No. :77-19952
01/15/2026 5 21.7 99.1 FP 2 100.0 18.5 99.1 95 D6938 Pass
Location : Pipeline 2.1 , Elv/Depth :4 to 5 feet over pipeline
Comment : Gauge Serial No. :77-19952
01/15/2026 6 20.9 96.1 FP 2 100.0 18.5 96.1 95 D6938 Pass
Location : Retaining wall #5, Elv/Depth :3 baskets
Comment : Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, January 15, 2026
Reviewer Name / DateKenneth Mosman, February 04, 2026