- Home
- Density Test Report Report ID: 89314
- Edit Download Report
Density Test Report
Date :01/19/2026
Project No :2025C215
Client Company :Artisan
Arrival Time :01/19/2026 09:00
Onsite Hours :08:30
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :sunny cold
Departure Time :01/19/2026 17:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 01/19/2026 | 1 | 14.7 | 102.4 | 2025-033 SP | 104.0 | 16.2 | 98.5 | 95 | D6938 | Pass |
| Location : | Backfill for 8" PVC sanitary sewer line , Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 01/19/2026 | 2 | 14.2 | 103.6 | 2025-035 SP | 107.8 | 13.0 | 96.1 | 95 | D6938 | Pass |
| Location : | Backfill for 8" PVC sanitary sewer line , Elv/Depth :2.5 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, January 19, 2026
Reviewer Name / DateKenneth Mosman, February 04, 2026
