Density Test Report

Date :01/21/2026
Project No :2025C269
Client Company :Lewis Contracting
Arrival Time :01/21/2026 14:00
Onsite Hours :02:00
Name of the Project :Main St. & First Ave. - Mixed-use
Project Location :Lilburn
Weather :Sunny
Departure Time :01/21/2026 16:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/21/2026 1 28.4 89.4 2026-010 98.1 22.4 91.1 98 D6938 Fail
Location : Pavement area north side of site between structure F2 and F3, Elv/Depth :at finished grade
Comment : Gauge Serial No. :91643
01/21/2026 2 29.0 89.2 2026-010 98.1 22.4 90.9 98 D6938 Fail
Location : Pavement area north side of site between structure F2 and F3, Elv/Depth :at finished grade
Comment : Gauge Serial No. :91643
01/21/2026 3 27.4 89.0 2026-010 98.1 22.4 90.7 98 D6938 Fail
Location : Pavement area north side of site between structure F2 and F3, Elv/Depth :at finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, January 21, 2026
Reviewer Name / DateKenneth Mosman, February 09, 2026