- Density Test Report Report ID: 89481
- Edit Download Report
Density Test Report
Date :01/20/2026
Project No :2025C269
Client Company :Lewis Contracting
Arrival Time :01/20/2026 08:30
Onsite Hours :07:30
Name of the Project :Main St. & First Ave. - Mixed-use
Project Location :Lilburn
Weather :sunny
Departure Time :01/20/2026 16:00
ASEC Technician Name :Samara Simha Reddy Kandi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 01/20/2026 | 1 | 29.6 | 70.8 | 2025-057 | 92.1 | 25.7 | 76.9 | 95 | D2937 | Fail |
| Location : | Between points F2-F3, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Soil is above optimum moisture content and does not meet specified compaction requirements. Area requires aerating and re-compaction. | |||||||||
| 01/20/2026 | 2 | 28.9 | 72.2 | 2025-057 | 92.1 | 25.7 | 78.4 | 95 | D2937 | Fail |
| Location : | Between F2-F3, Elv/Depth :3 feet below finished grade | |||||||||
| Comment : | Material is excessively wet and failed to achieve the specified compaction. | |||||||||
Technician Signature / DateSamara Simha Reddy Kandi, January 20, 2026
Reviewer Name / DateKenneth Mosman, February 09, 2026