Skip to content

Density Test Report

Date :01/21/2026
Project No :2025C211
Client Company :Pulte
Arrival Time :01/21/2026 07:30
Onsite Hours :06:30
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :01/21/2026 14:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/21/2026 1 16.3 95.7 FP 2 100.0 18.5 95.7 95 D6938 Pass
Location : Retaining wall #5 , Elv/Depth :7 baskets
Comment : Gauge Serial No. :38069
01/21/2026 2 21.2 91.9 FP 2 100.0 18.5 91.9 95 D6938 Fail
Location : Retaining wall #5 , Elv/Depth :7 baskets
Comment : will retest Gauge Serial No. :38069
01/21/2026 3 retest 20.3 92.8 FP 2 100.0 18.5 92.8 95 D6938 Fail
Location : Retaining wall #5 , Elv/Depth :7 baskets
Comment : will retest Gauge Serial No. :38069
01/21/2026 4 retest 18.3 95.9 FP 2 100.0 18.5 95.9 95 D6938 Pass
Location : Retaining wall #5 , Elv/Depth :7 baskets
Comment : Gauge Serial No. :38069
01/21/2026 5 18.3 107.2 2025-055 107.3 15.5 99.9 98 D6938 Pass
Location : SSMH5.0 pipeline in roadway by lots 18 - 22, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSean Willett, January 21, 2026
Reviewer Name / DateKenneth Mosman, February 09, 2026