- Home
- Density Test Report Report ID: 89552
- Edit Download Report
Density Test Report
Date :01/15/2026
Project No :2025C244
Client Company :McCallan Group
Arrival Time :01/15/2026 8:00
Onsite Hours :10:00
Name of the Project :Cassville Rd tract, proposed Burrito Wrap
Project Location :Cartersville
Weather :cold
Departure Time :01/15/2026 18:00
ASEC Technician Name :Mahendra Mylabathula
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 01/15/2026 | 1 | 23.8 | 92.6 | 2025-050 | 103.5 | 21.4 | 89.5 | 95 | D2937 | Fail |
| Location : | Lot #46, Elv/Depth :3 feet below finished grade | |||||||||
| Comment : | ||||||||||
| 01/15/2026 | 2 | 21.7 | 98.8 | 2025-050 | 103.5 | 21.4 | 95.5 | 95 | D2937 | Pass |
| Location : | Lot #45, Elv/Depth :3 feet below finished grade | |||||||||
| Comment : | ||||||||||
| 01/15/2026 | 3 | 24.4 | 89.1 | 2025-050 | 103.5 | 21.4 | 86.1 | 95 | D2937 | Fail |
| Location : | Lot #44, Elv/Depth :3 feet below finished grade | |||||||||
| Comment : | ||||||||||
| 01/15/2026 | 4 | 26.1 | 91.4 | 2025-050 | 103.5 | 21.4 | 88.3 | 95 | D2937 | Fail |
| Location : | Lot #43, Elv/Depth :3 feet below finished grade | |||||||||
| Comment : | ||||||||||
Technician Signature / DateMahendra Mylabathula, January 15, 2026
Reviewer Name / DateKenneth Mosman, February 12, 2026
