Density Test Report

Date :01/28/2026
Project No :2025C215
Client Company :Artisan
Arrival Time :01/28/2026 09:00
Onsite Hours :08:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :cloudy
Departure Time :01/28/2026 17:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/28/2026 1 13.4 103.4 2025-035 SP 107.8 13.0 95.9 95 D6938 Pass
Location : Backfill for 24" RCP storm line between D11 and D12, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
01/28/2026 2 14.1 103.9 2025-035 SP 107.8 13.0 96.4 95 D6938 Pass
Location : Backfill for 24" RCP storm line between D11 and D12, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
01/28/2026 3 14.7 104.1 2025-035 SP 107.8 13.0 96.6 95 D6938 Pass
Location : Backfill for 24" RCP storm line between D11 and D12, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
01/28/2026 4 12.8 105.4 2025-035 SP 107.8 13.0 97.8 95 D6938 Pass
Location : Backfill for 24" RCP storm line between D11 and D12, Elv/Depth :2.5 feet below finished grade
Comment : Gauge Serial No. :91643
01/28/2026 5 13.0 105.5 2025-035 SP 107.8 13.0 97.9 95 D6938 Pass
Location : Backfill for 18" RCP storm line between D12 and D19, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, January 28, 2026
Reviewer Name / DateKenneth Mosman, February 12, 2026