Skip to content

Daily Field Report

Date :01/30/2026
Project No :2025C269
Client Company :Lewis Contracting
Arrival Time :01/30/2026 08:30
Onsite Hours :07:00
Name of the Project :Main St. & First Ave. - Mixed-use
Project Location :Lilburn
Weather :sunny
Departure Time :01/30/2026 15:30
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Crew 1 began backfilling operations at locations B9–B11. The first two lifts were placed in thicknesses of approximately 6–8 inches and compacted using a jumping-jack compactor. The next two lifts were compacted with a double-drum roller, followed by an additional lift compacted using a sheep’s foot roller.

Crew 2 continued work from point E1 to Detention Pond 1 by placing backfill in 6-to-8-inch lifts and compacted. After completing this area, the crew performed compaction around the manhole at point F2 using a double-drum roller.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateSamara Simha Reddy Kandi, January 30, 2026
Reviewer Name / DateKenneth Mosman, February 18, 2026